Cooperation for 25-Ton Large-Scale Gold Mine in Guangxi 广西25吨大型金矿招商合作
- May 21, 2016
- 1 min read

Company
项目单位
Private Owners
个体
Mineral Species
矿种
Gold
金
Mining Rights
矿权设置
Mining Rights
采矿权
Project Location
国家/地区
Guangxi, China
中国/广西
Cooperation Type
合作方式
Cooperation
合作
Project Overview
项目概况
The gold mine is subjected to mining rights with a period of validity expiring in January 2017 and an area of 3.8 square km. Licensing is essentially completed such as for the mining license and gold mining work safety license. Infrastructure in the mine is relatively available, with the construction and use of a tailings pond, crushing platform, lab and a staff dormitory all having been accomplished. The total resource reserves of the mine are up to 25 t. Cooperation is envisioned as either whole transfer or partial equity transfer.
金矿区为采矿权,有效期至2017年1月,面积 3.8 km证件基本齐全采矿证,黄金开采安全生产许可证,矿 山基础设施较完善,尾矿库,破碎台,化验室,员工宿舍等 都已建设完工投入使用,矿区总资源储量可达25吨,合作 方式整体转让或出让部分股权。























Comments